Dog Leash Long PVC Leashes Durable Training Recall Long Lead 1.5M 3M 6M 9M Great for Training Beach Yard Play
SPECIFICATIONS
Brand Name: NONE
CN: Guangdong
Choice: yes
Dog Leash Type: Basic Leashes
Feature: Personalized
High-concerned chemical: None
Is Smart Device: No
Lifestage: All stages
Material: Plastic
Origin: Mainland China
Pattern Type: Solid
Season: all seasons
Type: Leashes,Dogs
is_customized: No
describe
Material:PVC
Length:5FT/1.5M 10FT/3M 20FT/6M 30FT/9M
Applicable Breeds:Small Medium Large Dogs
Scenes:Dog Training Beach Yard Camping Swimming
Features: doesn't get wet and smelly Odor-resistant, easy to clean, and never tangles
Color:Blue Red Green Black Orange
Advantage
1. The dog leash is made of the strongest climbing rope with PVC coating. 100% Eco-friendly. The dog leash is durable and can also hold 600 lbs of pulling force. Great for large, small, medium dogs.
2. Waterproof design: Based on the consideration of rainy days or beach walks, the belt is coated with PVC. It doesn't get wet and smelly. Odor-resistant, easy to clean, and never tangles
3. Lightweight and colorful, match all dog for your dog. Our dog leash length is 5 feet,10 feet,20feet,30feet. For dog walking or dog training.
4. Comfortable and secure, yet soft enough to not tear your hands while training, walking or running with pets. The 360°rotatable clasp is made of high-quality zinc alloy. The collar will not disengage without the trainer loosening it.











